top of page
Search

ESC supplied materials to Melbourne's CBD, Victoria Harbour Project in Australia

Writer's picture: ESC GroupESC Group

Updated: Sep 19, 2021


ESC supplied Gr Q345B SSAW Pipe Piles, including clutches, Gr. Q345B SSAW Pile Shoes & ESC-S-CRZ20-700 Gr. Q345B CR sheet piles to Edgen Murray for the Project Victoria Harbour in Australia.

ESC’s involvement with the project began with a series of meetings with Edgen Murray and Lend Lease Engineering(Developer) during which some alternative design options were proposed by ESC which eventually resulted in the design being changed from Hot rolled Sheets (Arcelor AZ19) to a totally Cold Rolled Sheet and Clutch design, thus saving the client in valuable time and money, whilst still achieving all the design criteria set by the designers.

13 views

ESC Group

Acclime Offices
17/F United Centre, 
95 Queensway  Admiralty
Hong Kong
+852 8198 2349

 

  • ESC Group Linkedin
  • ESC Group Facebook
  • ESC Group Twitter
  • ESC Group Youtube
  • ESC Group Instagram
  • ESC Group Pinterest
APP STORE.png
google play_edited.png

© 2018 ESC Group.

bottom of page